Employee Schedule

Monday, December 23, 2024 Job Schedule Employee Job Name (#) Start Time Shop Aceves, Raymond Off No Arevalo, Otilio Off No Arnold, Danny UCLA Slichter (#25W166)PM: Dave Wells No Ball, Danny UCLA Slichter (#25W166)PM: Dave Wells No Bonney, Royce Aerojet (#24J297)8900 DeSoto Ave.Canoga Park 91309PM: John Bascom 6:00 AM No Boyd, Dan UCLA Boelter (#24W249)PM:…

Read More

PPM Current Jobs

Current Jobs 20-210 St. John’s DW Heater #4 Tube Bundle & CW Supply 22-190 Scrivner House 242 Point Mugu B372 Renovation 22-252 Del Sol HS Portable Trailers 299 Long Beach Water Dept. GWTP HVAC Replacement 23D160 Valley Presbyterian Lab Equipment Replacement 23R209 Pacifica HS Drinking Fountain & Bottle Filler 23R212 Oxnard HS Drinking Fountain &…

Read More

Edwards Air Force Base B606 Munitions Building

Project Value: $306,000 Date Completed: In Progress PROJECT DESCRIPTION Design, build and construct new munitions maintenance building to include site sewer, water and gas. Construct building plumbing to restrooms, breakroom and munitions maintenance bay floor drains, and low pressure (160 PSI), and high pressure (3500 PSI) compressors and compressed air distribution piping.

Read More

Aerospace Bldg. A6A/A6B Clarifier Replacement

Project Value: $324,800 Date Completed: January 2024 PROJECT DESCRIPTION Replace two (2) existing 1500 gallon underground clarifiers with new 3000 gallon underground clarifiers. Reroute and connect required waste and vent piping, tank PH sensors, chemical injection piping, and compressed air piping used for tank agitation to new clarifiers. All work was performed while building remained…

Read More

Fallbrook B103 Renovation – Camp Pendleton

Project Value: $237,500 Date Completed: November 2023 PROJECT DESCRIPTION Provide and install new 20 HP air compressor, refrigerated air dryer and filter system, and run compressed air piping to 53 workstations in building. Add service sinks and emergency eyewash stations at 2 locations in the building.

Read More

Channel Islands ANG Replace Water Valves

Project Value: $360,200 Date Completed: May 2023 PROJECT DESCRIPTION Install two (2) new backflows and one (1) water meter on 12” main water supply, and install new water meters, pressure regulators, and isolation valves, on supply lines to all 13 buildings at the Channel Islands Air National Guard Base.

Read More

Fort Irwin Library

Project Value: $429,200 Date Completed: November 2021 PROJECT DESCRIPTION Construction of new 8000 square foot library at the Fort Irwin Army Base. Our scope included installation of site sewer, gas, domestic and fire water, building plumbing systems, and hydronic heating equipment and piping.

Read More