Commercial/Industrial
Edwards Air Force Base B606 Munitions Building
Project Value: $306,000 Date Completed: In Progress PROJECT DESCRIPTION Design, build and construct new munitions maintenance building to include site sewer, water and gas. Construct building plumbing to restrooms, breakroom and munitions maintenance bay floor drains, and low pressure (160 PSI), and high pressure (3500 PSI) compressors and compressed air distribution piping.
Read MorePoint Mugu B372 Renovation
Project Value: $190,800 Date Completed: In Progress PROJECT DESCRIPTION Complete renovation of all nine restrooms in existing three-story hangar building at the Point Mugu Naval Base.
Read MoreAerospace Bldg. A6A/A6B Clarifier Replacement
Project Value: $324,800 Date Completed: January 2024 PROJECT DESCRIPTION Replace two (2) existing 1500 gallon underground clarifiers with new 3000 gallon underground clarifiers. Reroute and connect required waste and vent piping, tank PH sensors, chemical injection piping, and compressed air piping used for tank agitation to new clarifiers. All work was performed while building remained…
Read MoreFallbrook B103 Renovation – Camp Pendleton
Project Value: $237,500 Date Completed: November 2023 PROJECT DESCRIPTION Provide and install new 20 HP air compressor, refrigerated air dryer and filter system, and run compressed air piping to 53 workstations in building. Add service sinks and emergency eyewash stations at 2 locations in the building.
Read MoreChannel Islands ANG Replace Water Valves
Project Value: $360,200 Date Completed: May 2023 PROJECT DESCRIPTION Install two (2) new backflows and one (1) water meter on 12” main water supply, and install new water meters, pressure regulators, and isolation valves, on supply lines to all 13 buildings at the Channel Islands Air National Guard Base.
Read MoreFort Irwin Library
Project Value: $429,200 Date Completed: November 2021 PROJECT DESCRIPTION Construction of new 8000 square foot library at the Fort Irwin Army Base. Our scope included installation of site sewer, gas, domestic and fire water, building plumbing systems, and hydronic heating equipment and piping.
Read MoreNASA Armstrong Flight Research Center Water Distribution
Project Value: $2,042,600 Date Completed: November 2019
Read MoreNASA Dryden Research Sewer Replacement
Project Value: $731,300 Date Completed: January 2014
Read MoreAmgen Replacement of Steam Traps
Project Value: $66,200 Date Completed: September 2012
Read MoreRichard S. Smith Trust Office Building
Project Value: $169,000 Date Completed: August 2011
Read More